RegionGlobal Website
News Center
News Center
Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd. annual output of 2.4 million 12 inch semiconductor wafer recycling project equipment move in ceremony was held ceremoniously
2021-01-08

    In the first week of 2021, a strong cold wave brought the highest temperature of Tongling town in the south of the Yangtze River directly below zero. The wind was cold, but it did not resist the enthusiasm of every Ferrotec person. On January 8, the equipment move in ceremony of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd. with an annual output of 2.4 million 12 inch semiconductor wafers recycling project was solemnly held in fuluode Changjiang semiconductor factory. Yao Guiping, deputy secretary and head of Yi'an District, Chen Jie, member of standing committee and executive deputy head of Yi'an District, Zhou Changsheng, deputy head of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd., and ferrot, representative of Japan Magnetic Technology Holding Co., Ltd He Xianhan, chairman of the board of directors of EC (China) group and chairman of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd., Guo Jianyue, general manager of Shanghai Shenhe thermal magnetic Electronics Co., Ltd., Zhan tingchun, general manager of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd., Xu Lei, chairman of Hongchi Asia logistics (Jiangsu) Co., Ltd., and representatives of Yian district Party committee, government and equipment manufacturers Nearly 100 representatives and representatives of relevant parties in the construction project witnessed this important moment.

微信圖片_20210113085110.png


    Equipment moved in, ceremony completed

    The whole equipment moving in ceremony was brief and warm. Mr. Zhan tingchun, general manager of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd., Mr. Xu Lei, chairman of Hongchi Asia Logistics (Jiangsu) Co., Ltd., Mr. He Xianhan, representative of Japan Magnetic Technology Holding Co., Ltd., chairman of Ferrotec (China) group and chairman of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd., delivered speeches one after another Yao Guiping, deputy secretary of the district Party committee and head of the District, announced that the equipment move in ceremony of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd. with an annual output of 2.4 million 12 inch semiconductor wafer recycling project was officially launched. With one of the core equipment of wafer recycling process, CMP equipment imported from Japan moved in slowly, and the equipment moving in ceremony was completed successfully.

稿定設計導出-20210113-105047.jpg


    Regeneration business to fill the gap of industry development

    After 383 days and nights of hard work of all employees, the first batch of high-precision equipment for the 2.4 million 12 inch silicon wafer recycling project of Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd. was moved in, marking the smooth introduction of the project and a milestone. In the next 2-3 months, Ferrotec (Anhui) Changjiang Semiconductor Material Co., Ltd. will complete the equipment moving in, equipment positioning, secondary process piping, equipment installation and commissioning, process commissioning, quality identification and other important work of the first 12 inch production line, strive to produce the first high-quality 12 inch semiconductor regenerative silicon wafer in March 2021, and enter the mass production stage in the second quarter, so as to fill the domestic demand The gap of large-size silicon wafer recycling business breaks the highly monopolized situation of overseas enterprises, makes up for the short board of China's semiconductor industry, and makes positive contributions to the development of China's integrated circuit industry.